BASS Gold announces January–September 2024 operating results and the company's upcoming plans

31.10.24 10:23
/KASE, October 31, 2024/ – BASS Gold LLP (Ulytau region), whose bonds are officially listed on Kazakhstan Stock Exchange (KASE), has provided KASE with the following press release dated October 31, 2024: quote BASS Gold LLP extracted 41.0 thousand tons of gold-bearing ore from the Ushshoky deposit in January-September 2024, which is at the level of extraction for the same period in 2023. It should be noted that in April of this year, a new gold extraction plant was launched, which represents a complete cycle of processing ore mined at the deposit, with the final product obtained in the form of Dore alloy. Since the launch of the processing plant, the mined ore has been sent for processing to the new plant (the volume of processed ore was 26.1 thousand tons with an average grade of 2.3 grams of gold per ton as of September 30, 2024), whereas previously the ore was used to produce concentrate by flotation. The output of finished products in Dore alloy amounted to 44 kg of gold. unquote The complete press release is available at https://kase.kz/files/emitters/FPST/fpst_relizs_311024_15.pdf [2024-10-31]